The 4350water Blog highlights some of the issues relating to proposals for potable reuse in Toowoomba and South East Qld. 4350water blog looks at related political issues as well.

Wednesday, November 26, 2008

Great Artesian Basin used to top up Toowoomba water supply ...

Excerpt from ABC News:

Great Artesian Basin used to top up Toowoomba water supply

26 November 2008

The Darling Downs city which rejected recycled water for drinking two years ago, has started pumping from the Great Artesian Basin to top up water supplies.

Councillor Paul Antonio says last week's storms only increased Toowoomba's combined dam levels to 11.5 per cent.

He says one of five emergency bores is now online.

"One bore is being drilled and tested and is awaiting a permanent installation, the second bore has been drilled and tested and is currently being pumped using temporary equipment into the Cooby dam," he said.

"The third bore has been drilled and air tested and all of these bores have proven to have good water and to have some ability to supply."


See -Great Artesian Basin used to top up Toowoomba water supply.

3 Comments:

Anonymous Anonymous said...

11.5% is better than 9% - an extra 6 months supply with lots more to come

7:09 PM, November 26, 2008

 
Anonymous Anonymous said...

It proves we don't need to drink recycled sewerage water. There are other options such as the gas water and natural rain.

9:02 PM, November 26, 2008

 
Anonymous Anonymous said...

It proves we don't need to drink recycled sewerage water. There are other options such as the gas water and natural rain.

9:02 PM, November 26, 2008

 

Post a Comment

<< Home